step 3 – placement
Study the diagram and follow the directions to glue the applied piece onto the foundation page.

Click the arrow at the top right to see how to glue the applied piece onto the foundation page.

Apply glue to both tabs.
Mountain fold in half.
Glue one tab to the foundation page by placing the point where the two tabs meet on the gutter crease. The Vertical V Placement Diagram and the model describe this placement.
Fold the foundation page closed. This will glue the second tab to the opposite side.
Open!